United Space Alliance Central Plant

Contract Amount = $3,500,000

As Prime Contractor to United Space Alliance, the Way Engineering Design/Build Team developed and installed a 1400-ton direct expansion retrofit with a new, air-cooled, chilled water Central Plant, as well as a one (1) million gallon thermal energy storage system, complete with a state-of-the-art Andover DDC Control System.